Double flagship project: The Skills Center «Learning Lab» in Bike Kingdom Lenzerheide 

Experience instead of explain. Here, awareness is made tangible, and your skills are brought out to their fullest potential.

FACTS

ProjectSkills Center Learning Lab Lenzerheide 
ClientMunicipality of Vaz/Obervaz
LocationLenzerheide, Switzerland
Construction periodAutumn 2025 and Spring 2026
Project managementLukas Häusler
Participating A-TeamDevelopment: Kevin, Benni, Flurin
Construction: Colin, Pablo, Bruno, Phil, Joel

 

The Learning Lab in Bike Kingdom Lenzerheide is a pioneering training center for the next generation of mountain bikers. ALLEGRA was involved in many aspects of the project; our team assisted with development and planning and then built the skills center. The conceptual foundations were developed with numerous partners as early as 2024. LMS AG later contributed additional destination-specific perspectives. Our trail crew laid the initial construction groundwork in the Canols forest area in autumn 2025 and completed it in spring 2026. The official opening took place at the end of June 2026. This marks a milestone, and the project is intended to set an example for the entire region.

The Skills Center in the valley area is unique of its kind and a lightweight project in two respects:

1) SENSITIZATION

Making coexistence encounters tangible

This is about far more than traditional technical instruction or achieving cycling safety. A key aspect of the Fairtrail concept is embodied here: the entire area was developed under the motto "Raising Awareness Through Riding Fun." Important coexistence issues on our trails aren't explained, but experienced. Specifically, this means that instead of information panels, real, intuitive learning situations are created on the trail. The message: correct behavior is experienced, not read. At various playful stations, visitors discover on their bikes how agriculture, forests, wildlife, and other people interact with them on the trails. Each station recreates a real trail situation and guides participants intuitively and playfully toward appropriate action.

2) Variety

Maximum learning curve per square meter

Where else can you find such a wide variety of options for everything a mountain biker's heart desires? A jumpline next to tech trails. An easy, green loop next to challenging tech trails? Roots, switchbacks, and rock gardens alongside flowing burms and berms. Every feature, every trail, every element in the Learning Lap is, individually, an important component for learning, improving, and perfecting safe and excellent mountain biking skills. But seen together in one area, it's an unbeatable offering – almost guaranteeing a huge learning curve and a sense of accomplishment.

Kevin explained this very well and summed it up perfectly in a LinkedIn post:

DETAILS

The centerpiece is a main loop, complemented by technical lines of varying difficulty and a jump line. A separate balance area was deliberately omitted to minimize the impact on the landscape. Furthermore, a direct, conflict-free connection to the Canols sports field was created, allowing the bike school to lead groups safely into the terrain without interaction with motorized traffic.

🎥 Concept, Film & Edit: Max Schwarz

The training center addresses the most important conflict areas of mountain biking in the region:

Agriculture & Alpine farming

Fence crossings, herds of mother cows, and livestock guardian dogs are integrated into realistic but safe situations. Children learn when to ride, push, or stop. The Plantahof and local farmers, among others, provide support.

Forestry and forest management

Issues such as temporary closures or illegal shortcuts are made visible along the trails. A forestry figure points out logging operations or restricted areas and playfully teaches correct behavior. Among those involved is the responsible district forester, Sandro Sutter.

Nature & Wildlife

Animal figures, wildlife resting zones, and playful tasks such as "drive quietly" or "count animals" promote sensitivity towards wildlife. The initiative is supported by game wardens and the Graubünden Office for Hunting and Fishing.

Human-human coexistence

Signage, designated coexistence areas, and safety rules prepare children early on for appropriate behavior in the bike park and in public spaces. The concept is supported by organizations including Fairtrail Graubünden and the Department of Civil Engineering.

HOLD ONTO!

The training center opened on June 23rd. How many rounds can be completed in just 4 months, by mid-October 2026?

140,000 laps!

A big thank you...

…to Lenzerheide Marketing and Support AG , Dave Spielmann, Ruedi Gertsch, Marc Schlüssel, Swiss Snow Sports and Bike School Lenzerheide, Municipality of Vaz/Obervaz, SwitzerlandMobility, communicaziun.ch, Lenzerheide Bergbahnen AG and to our A-Team and everyone else involved for your courage and commitment to trying new things.

🎥Photos: Max Schwarz

MORE OF ALLEGRA

A trail with history: The blue style trail Tracouet in Nendaz 

The trail blends the experience and working methods of two worlds. The result: double the flow, double the creativity, and a great sense of community.

Exchange and practical experience: ALLEGRA study days in Flims and Lenzerheide 

At the end of September, two ALLEGRA study days took place in Flims and Lenzerheide. The two days focused on different aspects of mountain biking and hiking trail infrastructure.

Construction of the rOXy balboa singletrack trail in the Ochsenkopf bike park (1024).

A trail whose character changes so subtly, and whose variety brings a smile to everyone's face.

TEAM NEWS: Hello Marcel & Crew – welcome to the ALLEGRA Switzerland family!

With the dissolution of Sendas AG, ALLEGRA Switzerland is strengthening its team with experienced professionals: Five new faces are now enriching our A-Team in the office and on the construction site, bringing with them a wealth of expertise and passion.

Strategy development Dolomiti Bike Galaxy

With a single ticket to over 100 lifts with bike transport: The Dolomiti Bike Galaxy is one of the largest mountain bike network systems.

Reshape Style Trail Allières in La Berra

From blue to red: The new red style trail after the reshape. A trail that respects the character of the area. A trail that allows water to run off. A trail that will last and be incredibly fun for many years to come.

Mountain bike product development in Lugano

A destination where outdoor activities and leisure are perfectly combined.

Mountain bike strategy Saint Lary

Like many other mountain destinations, Saint-Lary is currently exploring ways to diversify its offerings and compensate for what is lacking in the winter season with summer activities.

Potential analysis and concept development Gravel Northwest Iceland

Our mission in northwestern Iceland was to analyze and determine whether—and in which configuration—mountain biking and/or cycling could be used as a tool for the economic development of the region.

Product development Gravel Ruka-Kuusamo

After developing a gravel network with over 900 kilometers of routes, the next question arose: How do we market this offering? How can we differentiate ourselves from our competitors? And how can we attract potential guests to a region near the Arctic Circle?

Do you actually know

...what's really going on on your trails, hiking or cycling paths?

We use state-of-the-art technology to take (hybrid) frequency monitoring in alpine and urban areas to the next level!